CityRailTransit
Timeline of the Belo Horizonte (Brazil) Rail Transit Network

Metro (metrominas)

06-03-1985: Linha 1 > Eldorado - Lagoinha (11.1 km) [trial operation]
10-03-1986: Linha 1 > Calafate station added (trial operation)
01-07-1986: Linha 1 > Carlos Prates and Cidade Industrial stations added
[trial operation]
01-08-1986: Linha 1 > Eldorado - Lagoinha (+11.1 km)
01-04-1987: Linha 1 > Lagoinha - Central (+1.5 km)
30-04-1992: Linha 1 > Central - Sta. Efigênia (+1.6 km)
14-12-1992: Linha 1 > Sta. Efigênia - Horto (+2.7 km)
01-12-1993: Linha 1 > Santa Tereza station added
16-12-1994: Linha 1 > Horto - Santa Inês (+1.3 km)
30-04-1997: Linha 1 > Santa Inês - Minas Shopping (+3.2 km)
30-07-1999: Linha 1 > Vila Oeste station added
05-01-2002: Linha 1 > Minas Shopping - São Gabriel (+1.1 km)
22-04-2002: Linha 1 > São Gabriel - Primeiro de Maio (1.1 km)
[trial operation]
19-07-2002: Linha 1 > 1º de Maio - Floramar (3.1 km)
[trial operation]
__-09-2002: Linha 1 > Floramar - Vilarinho (1.6 km)
[trial operation]
07-12-2005: Linha 1 > São Gabriel - Vilarinho (+5.8 km)


Rome CityRailTransit Atlas
Metro A & Metro B

Toulouse CityRailTransit Atlas
Métro Line A & Line C

Istanbul CityRailTransit Atlas
Subway, Light Metro, Light Rail, Tramway & Underground Funicular
 



<< Back


This page was modified on March 18, 2017